BREAKING NEWS
Third round technical knockout for Joseph Parker ... Read more
Close

Steel skeleton fitted at 4 World Trade Center

Last updated 08:00 26/06/2012

Relevant offers

Americas

Stronger drunken-driving, other laws to take effect in Maryland, US What might Donald Trump be hiding in those tax returns he won't disclose? Why the second US presidential debate will be disastrous for Donald Trump Woman killed in US train crash had recently moved to New Jersey from Brazil Never touch anything that looks like Donald Trump's hair Clip surfaces of Donald Trump's remarks about teacher who had sex with a student Witnesses describe the carnage, after a US commuter train crashed in New Jersey One dead, more than 100 injured as commuter train crashes into New Jersey station Jerry Springer: Donald Trump 'is opposed to the idea of America' US woman starved, locked away ailing husband for two years

A final steel beam has been lifted atop a new World Trade Center skyscraper - the first expected to open at the New York site next year since the twin towers were destroyed on September 11th, 2001.

With BeBe Winans singing God Bless America, workers raised their hardhats in tribute as the mammoth beam rose slowly into the Manhattan sky, swaying from a steel rope hoisted by a crane.

A US flag attached to the bottom of the beam fluttered above several hundred spectators at the topping-off ceremony.

"Ten years later, it's pretty remarkable," said a teary-eyed Sally Rexach, a nurse who aids workers constructing 4 World Trade Center.

She was at ground zero just after September 11th, supporting workers who combed through the smoking debris in search of human remains.

"This is a very proud moment; it's full circle," she said, glancing across the 16-acre site where the uncompleted One World Trade Center in the northwest corner is already New York's tallest structure.

In the southeast corner facing the 9/11 memorial, the 72-story tower that was topped off is to open for business in 2013 - the first occupied high-rise at the new trade centre site since the attacks.

The 1.8-million-square-foot skyscraper, designed by Pritzker Prize-winning architect Fumihiko Maki, will primarily house commercial offices.

A third of the office space will be set aside for the headquarters of the Port Authority of New York and New Jersey, which owns the site.

An atrium will house shops and restaurants.

At the moment, it is the second tallest skyscraper on the rebuilt World Trade Center site after One World Trade Center, although two others towers eventually will surpass the height of 4 World Trade Center.

More than 100 construction workers signed their names to the white-painted steel, with elected officials and developer Larry Silverstein looking on.

"Everybody's put their blood, sweat and tears into this," said John Rzeznik, a project manager at the site.

Minutes earlier, in the half-completed, marble-graced entrance, Winans opened the ceremony by singing the national anthem. Listening to it, some construction workers were moved to hold their hardhats over their hearts.

Silverstein told those assembled that his goal as a developer was "to give New Yorkers back the city terrorists tried to take away."

After years of funding and planning disagreements that at times threatened progress at the site, Silverstein acknowledged, "It's been a very tough time." But, he added, "I've always believed in downtown New York."

In his remarks, New York State Assembly Speaker Sheldon Silver remembered that certain naysayers had warned lower Manhattan "was dead" after the terror attack.

"But Larry, you were right," Silver said. "Never bet against New York."

Some workers wore yellow T-shirts bearing the words, "Yes we can."

Ad Feedback

- AP

Special offers

Featured Promotions

Sponsored Content